Hot&Cold.energy

We found your home

6 BROOMFIELDS, DENTON

Detached106 m²EPC D65Mains gas1980s

Estimated boiler replacement

£1,900–£3,200

For a detached like yours · estimated installed cost

FreeNo obligationLocal installers

Your options for this home

Boiler replacement

£1,900–£3,200

Estimated installed cost · 5.5–8 kW

  • Existing mains gas
  • Suitable for your home size
  • Combi or system options
See details
  • Preliminary heat requirement 5.5–8.0 kW from 106.0 m² and construction era 1980s.
  • Existing wet central heating assumed where mains gas is present.

New central heating

£4,300–£7,000

Complete system estimate · 6–8.5 kW

  • Boiler / heat source
  • Radiators (~10)
  • Pipework & controls
See details
  • A complete new system priced on ~10 radiators, pipework and a boiler.
  • Radiator count is indicative from floor area and confirmed on survey.

Home air conditioning

£3,800–£5,700

Multi-split system estimate · 4–6 kW · ~3 units

  • Approx. 3 indoor units
  • Heating & cooling
  • Professional installation
See details
  • Total floor area is not the same as conditioned area; this reflects the selected room scenario.

Heating & cooling profile

From the available property and energy data, this 106m² 1980s detached home has a current EPC rating of D65 and mains-gas heating. HotAndCold estimates a space-heating requirement of approximately 5.5–8.0kW. Its current energy rating indicates moderate energy efficiency. The estimated heat demand per square metre is towards the lower end.

Estimated space-heating intensity
5275 W/m²
relatively lowProperty data confidence: Good

Hot&Cold snapshot

Property size
Substantially larger
Energy efficiency
Moderate
Heating intensity
Relatively low
Improvement potential
Significant
Main heating fuel
Mains gas
Cooling requirement
Medium

What stands out about this home

Larger than most EPC-recorded homes nearby
Relatively low modelled heating demand per m²
Detached property
Modern heating controls recorded

Why this estimate?

We calculate estimates using your property's size, type, age, heating fuel and EPC rating, along with typical installation costs — not a professional heat-loss survey.

How we calculated this

106 m²
Floor area
+
detached
Property type
+
EPC D65
Energy rating
+
Mains gas
Current fuel
Hot&Cold property model
5.5–8 kW
Estimated heating requirement for this property

What we found about your home

Property type
Detached
Floor area
106 m²
Energy rating
EPC D65
Main heating fuel
Mains gas
Approx. age
1980s
Location
DENTON, Tameside

We use publicly available data and industry models to generate this estimate. A final survey by an installer may vary.

How this home compares locally

Based on 31 EPC-recorded properties nearby.

Floor area
+56%
56% larger than the local median
EPC rating
0
0 EPC points above the local median
Mains gas
97%
97% of nearby EPC-recorded homes use mains gas
Property type
58%
this property type is 58% of nearby recorded homes

Sale history

Recorded sales for 6 BROOMFIELDS from HM Land Registry Price Paid data.

  1. £219,950
    May 2016 · Detached
  2. £99,950
    May 2001 · Detached

Contains HM Land Registry data © Crown copyright and database right. Sale prices are historic and not a current valuation.

Building

Built form
Detached
Internal area (EPC)
106 m²
Building footprint
~106 m²
Approx. dimensions
~15.8 × 9.0 m
Main building axis
NW–SE
Estimated floors
1
Nearest building
2.8 m

Footprint & dimensions derived from Overture Maps building data (ODbL). Approximate, not survey-grade.

How this home is constructed & heated

Recorded on its Energy Performance Certificate.

Walls
Cavity wall, filled cavity
Roof
Pitched, 75 mm loft insulation
Windows
Fully double glazed
Main heating
Boiler and radiators, mains gas
Heating controls
Programmer, TRVs and bypass
Hot water
From main system
Floor
Solid, no insulation (assumed)

Energy improvement potential

Current
D65
Potential
B82
+17
Significant improvement potential

Recommended improvements for this property

Measures from this home’s official Energy Performance Certificate assessment that could raise its rating and cut running costs, specific to 6 BROOMFIELDS, DENTON, MANCHESTER, M34 3TH.

  1. 1
    Upgrade heating controlsIndicative cost: £350 - £450

    The heating system should have a room thermostat to enable the boiler to switch off when no heat is required. A competent heating engineer should be asked to do this work. Insist that the thermostat switches off the boiler as well as the pump and that the thermostatic radiator valve is removed from any radiator in the same room as the thermostat. It is best to obtain advice from a qualified heating engineer.

  2. 2
    Solar photovoltaic panels, 2.5 kWpIndicative cost: £9,000 - £14,000

    A solar PV system is one which converts light directly into electricity via panels placed on the roof with no waste and no emissions. This electricity is used throughout the home in the same way as the electricity purchased from an energy supplier. The British Photovoltaic Association has up-to-date information on local installers who are qualified electricians. It is best to obtain advice from a qualified electrician. Ask the electrician to explain the options.

  3. 3
    Increase loft insulation to 270 mmIndicative cost: £100 - £350

    Loft insulation laid in the loft space or between roof rafters to a depth of at least 270 mm will significantly reduce heat loss through the roof; this will improve levels of comfort, reduce energy use and lower fuel bills. Insulation should not be placed below any cold water storage tank; any such tank should also be insulated on its sides and top, and there should be boarding on battens over the insulation to provide safe access between the loft hatch and the cold water tank. The insulation can be installed by professional contractors but also by a capable DIY enthusiast. Loose granules may be used instead of insulation quilt; this form of loft insulation can be blown into place and can be useful where access is difficult. The loft space must have adequate ventilation to prevent dampness; seek advice about this if unsure (particularly if installing insulation between rafters because a vapour control layer and ventilation above the insulation are required). Further information about loft insulation and details of local contractors can be obtained from the National Insulation Association (www.nationalinsulationassociation.org.uk).

  4. 4
    Floor insulationIndicative cost: £800 - £1,200

    Insulation of a floor will significantly reduce heat loss; this will improve levels of comfort, reduce energy use and lower fuel bills. Suspended floors can sometimes be insulated from below which means that the floor does not need to be lifted to install the insulation. Further information about floor insulation and details of local contractors can be obtained from the National Insulation Association (www.nationalinsulationassociation.org.uk).

  5. 5
    Replace boiler with new condensing boilerIndicative cost: £2,200 - £3,000

    A condensing boiler is capable of much higher efficiencies than other types of boiler, meaning it will burn less fuel to heat this property. This improvement is most appropriate when the existing central heating boiler needs repair or replacement, but there may be exceptional circumstances making this impractical. Condensing boilers need a drain for the condensate which limits their location; remember this when considering remodelling the room containing the existing boiler even if the latter is to be retained for the time being (for example a kitchen makeover). It is best to obtain advice from a qualified heating engineer. Ask the engineer to explain the options.

  6. 6
    Low energy lighting for all fixed outletsIndicative cost: £90

    Replacement of traditional light bulbs with energy saving recommended ones will reduce lighting costs over the lifetime of the bulb, and they last up to 12 times longer than ordinary light bulbs. Also consider selecting low energy light fittings when redecorating; contact the Lighting Association for your nearest stockist of Domestic Energy Efficient Lighting Scheme fittings.

  7. 7
    Solar water heatingIndicative cost: £4,000 - £6,000

    A solar water heating panel, usually fixed to the roof, uses the sun to pre-heat the hot water supply. This will significantly reduce the demand on the heating system to provide hot water and hence save fuel and money. The Solar Trade Association has up-to-date information on local installers.

Source: the property’s domestic EPC recommendations (open data). Indicative only — get a professional survey before committing to any measure.

A
B
C
D
E
F
G
Current: D65Potential: B82

Common questions

How much does a replacement boiler cost for a property like this?+

For this property we estimate an installed cost of £1,900–£3,200. This is indicative and based on the property's size, type and energy characteristics — your final price depends on equipment choice and an installer survey.

What size boiler might this property need?+

Our preliminary model estimates a heat requirement of around 5.5–8 kW. An installer confirms exact sizing on a heat-loss assessment.

How much would air conditioning cost here?+

A multi-split installation is estimated at £3,800–£5,700, depending on how many rooms you want to cool (around 3 indoor units in a typical layout).

Are these guaranteed prices?+

No — they are indicative estimates to help you understand likely costs before speaking to an installer. Your final price depends on equipment choice, installation complexity and a survey.

Other homes nearby

Ready to get exact prices?

Compare no-obligation quotes from vetted local installers for your property.