We found your home
32, MAKIN COURT
Estimated boiler replacement
£1,900–£3,200
For a flat like yours · estimated installed cost
Your options for this home
Boiler replacement
Estimated installed cost · 4–5.5 kW
- Fuel confirmed on survey
- Suitable for your home size
- Combi or system options
See details →
- • Preliminary heat requirement 4.0–5.5 kW from 59.0 m² and construction era 1960s.
- • Heating system type to be confirmed on survey.
New central heating
Complete system estimate · 4–5 kW
- Boiler / heat source
- Radiators (~5)
- Pipework & controls
See details →
- • A complete new system priced on ~5 radiators, pipework and a boiler.
- • Radiator count is indicative from floor area and confirmed on survey.
Home air conditioning
Multi-split system estimate · 4–6 kW · ~3 units
- Approx. 3 indoor units
- Heating & cooling
- Professional installation
See details →
- • Total floor area is not the same as conditioned area; this reflects the selected room scenario.
Heating & cooling profile
From the available property and energy data, this 59m² 1960s flat has a current EPC rating of D57 and its recorded heating. HotAndCold estimates a space-heating requirement of approximately 4.0–5.5kW. This property has moderate recorded energy efficiency — neither especially poor nor especially high. The estimated heat demand per square metre is around typical levels.
Hot&Cold snapshot
What stands out about this home
Why this estimate?
We calculate estimates using your property's size, type, age, heating fuel and EPC rating, along with typical installation costs — not a professional heat-loss survey.
How we calculated this
What we found about your home
- Property type
- Flat
- Floor area
- 59 m²
- Energy rating
- EPC D57
- Main heating fuel
- Electric
- Approx. age
- 1960s
- Location
- HEYWOOD, Rochdale
We use publicly available data and industry models to generate this estimate. A final survey by an installer may vary.
How this home compares locally
Based on 40 EPC-recorded properties nearby.
Building
- Built form
- Flat
- Internal area (EPC)
- 59 m²
- Building footprint
- ~547 m²
- Approx. dimensions
- ~46.1 × 21.9 m
- Main building axis
- E–W
- Estimated floors
- 2
- Nearest building
- 0.5 m
Footprint & dimensions derived from Overture Maps building data (ODbL). Approximate, not survey-grade.
How this home is constructed & heated
Recorded on its Energy Performance Certificate.
- Walls
- Cavity wall, as built, no insulation (assumed)
- Roof
- (another dwelling above)
- Windows
- Fully double glazed
- Main heating
- Electric storage heaters
- Heating controls
- Manual charge control
- Hot water
- Electric immersion, off-peak
- Floor
- Solid, no insulation (assumed)
Energy improvement potential
Recommended improvements for this property
Measures from this home’s official Energy Performance Certificate assessment that could raise its rating and cut running costs, specific to 32, MAKIN COURT, SCHOFIELD STREET, HEYWOOD, OL10 1DR.
- 1Low energy lighting for all fixed outletsIndicative cost: £20
Replacement of traditional light bulbs with energy saving recommended ones will reduce lighting costs over the lifetime of the bulb, and they last up to 12 times longer than ordinary light bulbs. Also consider selecting low energy light fittings when redecorating; contact the Lighting Association for your nearest stockist of Domestic Energy Efficient Lighting Scheme fittings.
- 2Cavity wall insulationIndicative cost: £500 - £1,500
Cavity wall insulation, to fill the gap between the inner and outer layers of external walls with an insulating material, reduces heat loss; this will improve levels of comfort, reduce energy use and lower fuel bills. The insulation material is pumped into the gap through small holes that are drilled into the outer walls, and the holes are made good afterwards. As specialist machinery is used to fill the cavity, a professional installation company should carry out this work, and they should carry out a thorough survey before commencing work to ensure that this type of insulation is suitable for this home. They should also provide a guarantee for the work and handle any building control issues. Further information about cavity wall insulation and details of local installers can be obtained from the National Insulation Association (www.nationalinsulationassociation.org.uk).
- 3Add additional 80 mm jacket to hot water cylinderIndicative cost: £15 - £30
Increasing the thickness of existing insulation by adding an 80 mm cylinder jacket around the hot water cylinder will help maintain the water at the required temperature; this will reduce the amount of energy used and lower fuel bills. The jacket should be fitted over the top of the existing foam insulation and over any thermostat clamped to the cylinder. Hot water pipes from the hot water cylinder should also be insulated, using pre-formed pipe insulation of up to 50 mm thickness (or to suit the space available) for as far as they can be accessed to reduce losses in summer. All these materials can be purchased from DIY stores and installed by a competent DIY enthusiast.
- 4Change heating to gas condensing boilerIndicative cost: £3,000 - £7,000
Changing the heating to use a mains gas boiler that provides both space and water heating will save money, as mains gas is currently cheaper than the fuel being used at present. A condensing boiler is capable of much higher efficiencies than other types of boiler, meaning it will burn less fuel to heat the property, but there may be exceptional circumstances making this impractical. Condensing boilers need a drain for the condensate which limits their location; remember this when considering remodelling the room containing the existing boiler even if the latter is to be retained for the time being (for example a kitchen makeover). This improvement is most appropriate when the existing heating system needs repair or replacement. It is best to obtain advice from a qualified heating engineer. Ask the engineer to explain the options. It is also recommended to change the electricity tariff to standard tariff when off-peak is no longer used.
- 5Floor insulationIndicative cost: £800 - £1,200
Insulation of a floor will significantly reduce heat loss; this will improve levels of comfort, reduce energy use and lower fuel bills. Suspended floors can sometimes be insulated from below which means that the floor does not need to be lifted to install the insulation. Further information about floor insulation and details of local contractors can be obtained from the National Insulation Association (www.nationalinsulationassociation.org.uk).
Source: the property’s domestic EPC recommendations (open data). Indicative only — get a professional survey before committing to any measure.
Common questions
How much does a replacement boiler cost for a property like this?+
For this property we estimate an installed cost of £1,900–£3,200. This is indicative and based on the property's size, type and energy characteristics — your final price depends on equipment choice and an installer survey.
What size boiler might this property need?+
Our preliminary model estimates a heat requirement of around 4–5.5 kW. An installer confirms exact sizing on a heat-loss assessment.
How much would air conditioning cost here?+
A multi-split installation is estimated at £3,800–£5,700, depending on how many rooms you want to cool (around 3 indoor units in a typical layout).
Are these guaranteed prices?+
No — they are indicative estimates to help you understand likely costs before speaking to an installer. Your final price depends on equipment choice, installation complexity and a survey.
Other homes nearby
Ready to get exact prices?
Compare no-obligation quotes from vetted local installers for your property.